g2 Energy are a Lloyds Registered Independent Connection Provider (ICP), which enables us to complete Contestable Works and grid connections at voltages up to 132kV. We have experience in working with all the regional DNO’s across the UK & Ireland for a number of High Voltage power projects across a number of sectors.

Full Turnkey Service

If you are considering any type of electrical power scheme, we can help. As a High Voltage Electrical and Civil ‘Balance of Plant’ specialist, we have the capability to offer a full turn-key service and can complete the design and build of a project utilising our in-house teams. This includes the initial liaison with the Distribution Network Operator (DNO); as well as full system studies and Earthing design of the scheme, through to on-site project management during the construction phase, through to final commissioning and site clearance.

In-house Design

g2 Energy have extensive in-house design capabilities within the electrical distribution, transmission and generation sector, working on projects up to 132kV. Our Design Engineers are highly experienced in working on projects throughout the UK and are able to offer flexibility to the differing DNO requirements and specifications. Our design capabilities have been further enhanced with our in-house CDEGS Earthing design team and specialist System Studies team.

We can provide clients with full Electrical, Civil and Structural layouts and designs in a number of formats using programmes such as AutoCAD, AutoCAD Electrical, Revit or Bentley Microstation.

Bespoke Containerised Substations

g2 Energy’s innovative Containerised Substation solutions create a time- and cost-saving solution for grid connection projects. Designed and assembled at our Head Office and Warehouse facilities, each container is designed to DNO and customer requirements. One of the main advantages of building the substation within a Container is that the substation arrives on site with pre-installed and fully tested switchgear, ready for immediate connection, followed by customer witness testing.

Net Zero Future

The UK government has set out targets for net zero emissions by 2050, with Scotland aiming to be net zero five years earlier. Not only this, but Consumers and the General Public are becoming more aware of the increasing need for sustainability, and conscious of the impact they are having on the environment.

For several reasons, the grid network is under increasing strain, including the huge increase in demand for electricity across the UK. Clean energy sources such as Wind, Solar, Gas Peaking Plants and Battery Storage sites are not only helping to balance the stability of the grid but also create a greener grid, taking us closer to the net zero commitment.

For more information on g2 Energy’s services, contact us on the following;